+1 (365) 363-6995 24/7 Emergency
Home Renovation in Etobicoke: Renovating Lakeshore, Kingsway and 1960s Houses

Blog / Renovation

Home Renovation in Etobicoke: Renovating Lakeshore, Kingsway and 1960s Houses

A home renovation in Etobicoke starts with a simple question: what kind of house is it? The former city stretches from the lake at Long Branch to the Humber River and up past Highway 401 to Rexdale, and its houses were built across a century. A narrow 1920s house in New Toronto, a stone Tudor in the Kingsway and a 1960s backsplit in Markland Wood need very different work, even when the owners ask for the same thing: a brighter main floor, a better kitchen, updated bathrooms and floors that match from room to room.

TGV Construction Group Inc. is a licensed and insured contractor that has completed more than 300 projects across the GTA and Ontario since 2017, including houses and condo suites in Etobicoke. Our home renovation services cover design, permits and every trade under one contract.

Etobicoke houses by era

Lakeshore villages. Long Branch, New Toronto and Mimico grew up along Lake Shore Boulevard from the early 1900s. Lots are narrow, many houses are one and a half storeys with low basements, and decades of small additions are common. Renovations here are about making a compact house work harder: opening the main floor, adding a second bathroom, gaining basement height where the structure allows, and dealing with older plaster, wiring and plumbing.

The Kingsway, Humber Valley and Islington. Many houses from the 1930s to the 1950s have brick or stone fronts, leaded glass, plaster mouldings and oak floors. Owners usually want a modern kitchen and bathrooms without losing that character. The work is more careful: matching trim, repairing plaster instead of tearing it out and planning ducts and wiring so they do not cut through details worth keeping.

Postwar neighbourhoods. Richview, Eringate, Markland Wood, West Deane Park, Thistletown and much of Rexdale were built in the 1950s and 1960s as bungalows, backsplits and sidesplits on generous lots. Their structure is usually sound. The kitchens are closed rooms, bathrooms are small, half-levels break up the floor plan and the electrical service is often too small for modern appliances.

Humber Bay Shores and other condo areas. Towers along the waterfront and near Islington and Kipling stations add a different kind of renovation, run under condominium rules. Our condo renovation guide for Toronto covers those.

What older Etobicoke houses usually hide

Opening walls in a house built before the 1960s often turns up the same few things. Planning for them from the start keeps a home renovation in Etobicoke on schedule instead of stopping it halfway.

Old wiring. Knob-and-tube wiring survives in some pre-1950 houses, often in the walls of the upper floor, and many insurers will not cover a house that still has it. Ungrounded circuits and 60 or 100 amp services are common in postwar homes. Replacing wiring while walls are open is far cheaper than fishing new cable through finished plaster later.

The water service. Toronto houses built before the mid-1950s may still have a lead pipe bringing water from the street. The City has a program for the public side; the private side, from the property line into the house, is the owner's. A renovation that already opens the basement wall is a good time to replace it.

Drains and foundations. Clay or cast-iron drains, a missing backwater valve, cracked parging and window wells without drains show up in basements across Etobicoke. Lots near Mimico Creek, Etobicoke Creek and the Humber can see higher water after heavy storms. Our Etobicoke waterproofing guide explains the options.

Refinished red oak strip floor with a fresh glossy finish in an empty living room
Our job: original oak floor sanded and refinished, Courtice.

Trees, ravines and heritage: Toronto rules that shape the plan

Etobicoke has some of the largest private trees in Toronto. Under the City's tree bylaws, a tree of 30 cm diameter or more on private property cannot be removed or injured without a permit, and digging near its roots counts as injury. On lots near a ravine, the ravine bylaw protects trees of any size and controls grading and fill. These rules decide where an addition, a deck or a new walkout can go, so they belong in the first meeting, not after the drawings are done.

A few streets and individual houses are listed or designated under the Ontario Heritage Act, and exterior changes to them need heritage review. Where a project needs more lot coverage, a larger addition or a smaller side yard than zoning allows, it goes to the Committee of Adjustment for a minor variance, which adds weeks to the schedule. Interior work rarely runs into either.

Home renovation in Etobicoke: the order of work

The order matters more in an older house than a new one, because the hidden systems and the visible finishes are tangled together.

Systems first. Electrical service and wiring, plumbing supply and drains, heating and ductwork, and any structural changes such as removing a wall between kitchen and dining room. Inspections follow before anything is closed.

Envelope next. Windows, exterior doors, insulation in the walls and attic and air sealing. Older Etobicoke houses lose a great deal of heat through the attic and the rim joist in the basement, and both are easy to fix while other work is underway.

Rooms after that. Kitchens and bathrooms need plumbing, venting and electrical in place, so they follow the rough-ins.

Finishes last. Floors that run through several rooms, stairs, doors, trim and paint go in when the heavy work is finished.

Freshly painted hallway wall with new white baseboard beside a kitchen doorway
Our job: painted hallway and new baseboard, Scarborough.

Keeping character while modernising

Some of the best Etobicoke renovations keep what the house does well. Solid oak strip floors from the 1940s and 1950s, often hidden under carpet, can be sanded and refinished and then extended into new rooms with matching boards. Plaster walls that are sound can be repaired and painted rather than replaced, which keeps the room quieter and saves a wall of dust. Original doors and casings can be stripped and reused, or copied in new material where an opening moves. Where a house has leaded windows or a fireplace with a stone surround, the plan works around them.

In postwar bungalows the character worth keeping is usually the light and the lot. Opening the kitchen to the living room, adding a larger window or sliding door to the yard and replacing dark panelling with light walls change how the house feels more than any finish.

The planning steps

  1. Find out what you have. Note the age of the house, the type of wiring, the water service pipe, the foundation and any past additions before deciding on finishes.
  2. Check the lot rules. Look for large trees, a ravine edge or a heritage listing that changes what can be built and which approvals are needed.
  3. Set priorities. Separate safety and building-system work from the rooms you want to change, and decide what fits the budget now.
  4. Book a site visit. Walk through the house with the contractor, open access panels and look at the basement, the attic and the electrical panel.
  5. Prepare drawings and permits. Structural changes, new bathrooms, basement units and additions go to Toronto Building; variances go to the Committee of Adjustment.
  6. Agree the sequence. Plan rough-in work first and floors, trim and paint last, with inspections booked between stages.
  7. Prepare the house. Protect floors and stairs, set up dust walls and decide which rooms the family keeps using.
  8. Finish and close the permit. Walk through every room, complete the deficiency list and keep the closed permit and warranty papers with the house records.

Budgeting across the whole house

A home renovation in Etobicoke covers many rooms and trades, so a single figure says little. The written quote after a site visit breaks the work into parts you can compare and phase. Room-level ranges are in our guides, such as the Etobicoke bathroom guide and the Etobicoke basement guide. Keep a contingency for what older houses hide, and decide early which upgrades, such as wiring and the water service, are worth doing while the house is open.

Home renovation in Etobicoke: frequently asked questions

What should I check first in an older Etobicoke house?

The electrical system, the water service pipe, the drains and the foundation. Houses built before the 1950s may still have knob-and-tube wiring or a lead water service, and these are easier and cheaper to replace while walls and floors are open for the renovation.

Do I need a permit for a home renovation in Etobicoke?

Etobicoke is part of the City of Toronto, so permits come from Toronto Building. Painting, flooring and replacing fixtures in the same place usually need none. Structural changes, new or moved bathrooms, basement units, larger window openings, decks above a set height and additions do.

Can I remove a tree to make room for an addition?

Not without approval if it is protected. Under Toronto's tree bylaws, trees of 30 cm diameter or more on private property, and trees on ravine-protected lots, need a permit to remove or injure, and work near the roots is restricted too.

Is it worth refinishing the old hardwood?

Often, yes. Many Etobicoke houses from the 1940s to the 1960s have solid oak strip floors under carpet. If the boards are thick enough to sand, refinishing keeps the original floor and costs less than replacing it.

How long does a home renovation in Etobicoke take?

A main floor refresh with floors, paint and trim can take a few weeks. A larger project with a kitchen, bathrooms and building-system upgrades often runs three to five months, plus the time needed for permits.

Start with a walk-through

We visit the house, look at the wiring, the plumbing, the basement and the attic, talk through the lot rules with you and send a written quote with a clear scope, order of work and schedule.

Phone (365) 363-6995, email estimating@tgvconstructiongroup.ca, or tell us about your renovation on the Get a Quote page.

Related reading: hiring a general contractor in Etobicoke, home renovation in Mississauga and home renovation in Oakville.

Free quote

Planning a project or dealing with damage?

TGV gives free quotes across the GTA. Emergencies: 24/7.

Get a Quote +1 (365) 363-6995

The TGV blog

Renovation know-how, delivered

Real costs, permit tips and restoration advice for GTA homes and businesses - written by the team that does the work.

  • Cost guides for GTA projects
  • Permits, timelines and checklists
  • One short email, only when we publish

By subscribing, you agree to receive an email from TGV Construction Group Inc. when we publish new blog posts - at most once a day. You can unsubscribe at any time. Privacy Policy

Ready to start your project?

Free quotes across the Greater Toronto Area. Water, fire or storm damage? Our team responds 24/7.