Bathroom Renovation in Etobicoke: Costs, Layouts and What to Expect

Blog / Bathroom

Bathroom Renovation in Etobicoke: Costs, Layouts and What to Expect

A bathroom renovation in Etobicoke usually costs between $22,000 and $55,000, depending on size, layout changes and the finishes you choose. Etobicoke has everything from 1950s bungalows in Humber Valley and Islington to 1960s back-splits in Richview, lakeside houses in Mimico and Long Branch, and towers along the Queensway and Humber Bay Shores. The bathroom in each of them comes with its own limits and opportunities.

TGV Construction Group Inc. is a licensed and insured contractor that has completed more than 300 projects across the GTA and Ontario since 2017. Our bathroom renovation services include everything from demolition to the last bead of silicone.

What shapes a bathroom renovation in Etobicoke

Post-war bungalows. Many Etobicoke bungalows have one main bathroom with a cast-iron tub, small tiles and galvanized or early copper pipes. Opening the walls is a good moment to replace old supply lines and add a shut-off valve. Floors sometimes need levelling after decades of settlement.

Split-levels and two-storeys. Houses from the 1960s and 1970s often have a main bathroom and a small ensuite. Joining a cramped ensuite to a closet can create room for a walk-in shower and a double vanity.

Condos. In condo buildings, the location of drains and risers is fixed, and the building's rules decide when noisy work can be done. Layouts focus on making the most of a compact space.

Basement bathrooms. Adding a bathroom below grade needs a drain at the right depth or an ejector pump. We check the existing rough-in, if there is one, before the design is settled.

White vanity with a dark-framed mirror in a freshly painted bathroom
Our job: new vanity, mirror and paint, Scarborough.

Where the budget goes

Labour for demolition, plumbing, waterproofing and tile is usually the largest line in a bathroom budget. The vanity, toilet, tub or shower base and fixtures come next, followed by tile, glass, lighting and ventilation. Moving the toilet or the shower drain is the change that raises cost the most, because it means opening the floor and often the ceiling below.

Ways to keep costs in check without cutting quality: keep the plumbing where it is, use a standard-size tub or shower base, choose large porcelain tiles for the floor, and spend on the things you touch every day, such as the shower valve and the vanity. For a wider view of what drives the total, see our condo bathroom cost guide for Toronto and our Mississauga bathroom cost guide.

The order of the work

  1. Measure and photograph the room. Note the location of the toilet, drain, window, door swing and any heating vent. These decide which layouts are practical.
  2. Decide what stays. Keeping the toilet and drain in place is the biggest single saving. Moving them is possible but adds plumbing and floor work.
  3. Choose tub or shower. Families with young children often keep a tub; many owners replace it with a large walk-in shower. If there is only one bathroom, keep at least one tub in the house for resale.
  4. Plan ventilation. A quiet exhaust fan vented to the outside, on a timer or humidity switch, protects the new finishes from moisture.
  5. Pick tile, fixtures and vanity. Choose before the start date. Special-order items can take weeks.
  6. Book the work. Confirm the start date, the expected length and how many days the room will be out of use.
  7. Demolish and inspect. Once the old finishes are off, check the subfloor, joists and pipes before anything new goes in.
  8. Waterproof, tile and finish. A full membrane in the shower area, then tile, glass, vanity, fixtures, paint and a final clean.

Waterproofing: the part you never see

Tile and grout are not waterproof. Behind them, the shower walls and floor need a continuous membrane that carries water to the drain. We use a sheet or liquid membrane system over cement board or foam board, with sealed corners, niches and pipe penetrations. Skipping this step is the most common reason bathrooms fail after a few years.

Ventilation is the other half. A fan sized for the room, vented outside rather than into the attic, keeps moisture away from paint, trim and the ceiling. In older Etobicoke houses, we often find fans that were never connected to a duct at all.

Wood-look porcelain tile floor and charcoal accent wall in a renovated bathroom
Our job: new tile floor and paint, Pickering.

Choosing finishes that last

Porcelain tile is our first choice for floors and shower walls. It is dense, hard-wearing and easy to clean. Large-format tiles mean fewer grout lines; small mosaics give better grip on a shower floor. For vanities, solid wood or high-quality plywood boxes hold up better to moisture than particleboard. Quartz counters resist stains.

Lighting changes how a bathroom feels. A ceiling light for general use, a light at the mirror for shaving and make-up, and sometimes a light in the shower give the room a finished look. LED fixtures rated for damp locations last for years.

Living with one bathroom during the work

Many Etobicoke bungalows have only one full bathroom, and that changes how the project is planned. Before demolition, we agree which days the toilet will be out of service and keep that window as short as possible. Often the old toilet is reinstalled temporarily at the end of the first day, or the new one is fitted early, so the family is never without one overnight. If there is a basement washroom, even a simple one, it carries the household through the tile stage.

Showering is the bigger issue. Some families use a gym, a neighbour or relatives for the two to three weeks the shower is out of use. Others plan the work around a holiday. Telling us your situation at the first visit lets us order the work so the room is usable again as soon as possible.

Planning for the next twenty years

A bathroom is renovated once every couple of decades, so it pays to think ahead. Solid blocking in the walls behind the toilet and in the shower allows grab bars to be added later without opening the tile. A handheld shower on a slide bar suits children and older adults alike. A slightly wider door and a low-threshold shower make the room easier for everyone.

A bathroom renovation in Etobicoke, step by step

Imagine a Humber Valley bungalow with a single 1950s bathroom. After demolition, the old cast-iron drain is replaced with plastic, the supply lines are replaced, and a shut-off is added. The floor is levelled, cement board goes down, and a membrane covers the shower area. A new tub with a tiled surround, a wider vanity, a new toilet, a vented fan and LED lighting complete the room. The family uses a second bathroom in the basement during the three weeks of work.

Bathroom renovation in Etobicoke: questions we hear most

How much does a bathroom renovation in Etobicoke cost?

Most full bathroom renovations in Etobicoke fall between $22,000 and $55,000. The lower end covers a standard-size bathroom with the layout unchanged; the upper end covers larger ensuites, moved plumbing, custom glass and premium tile. Your written quote sets the final price after a site visit.

How long does it take?

Two to four weeks for most bathrooms once materials are on site. Moving plumbing, structural repairs or custom glass can add time.

Do I need a permit?

Replacing fixtures in the same location usually does not need one. Adding a bathroom, moving drains or making structural changes does. In Etobicoke, permits are issued by the City of Toronto.

Can you renovate a bathroom in an Etobicoke condo?

Yes. Condo work needs the building's approval, insurance certificates, elevator bookings and set work hours, and we plan for all of them before the start date.

What is the best flooring for a bathroom?

Porcelain tile is the most durable choice and handles water well. Heated floor mats under the tile are a popular upgrade in winter.

Book a visit

We look at the room, the plumbing and the ventilation, talk about what you want, and send a written quote with a clear scope and schedule.

Phone (365) 363-6995, email estimating@tgvconstructiongroup.ca, or tell us about your bathroom on the Get a Quote page.

Related reading: general contractor in Etobicoke, vanity replacement costs in the GTA and the average cost of a bathroom renovation.

Every home is different. Prices on this website are only rough ranges from typical GTA projects, not a quote: your price depends on what we find on site, the size and condition of the space, the materials you choose and the permits needed, and it is set only in your written quote after a site visit.

Free quote

Planning a project or dealing with damage?

TGV gives free quotes across the GTA. Emergencies: 24/7.

Get a Quote +1 (365) 363-6995

The TGV blog

Renovation know-how, delivered

Real costs, permit tips and restoration advice for GTA homes and businesses - written by the team that does the work.

  • Cost guides for GTA projects
  • Permits, timelines and checklists
  • One short email, only when we publish

By subscribing, you agree to receive an email from TGV Construction Group Inc. when we publish new blog posts - at most once a day. You can unsubscribe at any time. Privacy Policy

Ready to start your project?

Free quotes across the Greater Toronto Area. Water, fire or storm damage? Our team responds 24/7.