+1 (365) 363-6995 24/7 Emergency
Kitchen Renovation Cost in Mississauga: Houses, Condos and Open-Concept Plans

Blog / Kitchen

Kitchen Renovation Cost in Mississauga: Houses, Condos and Open-Concept Plans

A kitchen renovation in Mississauga usually costs between $40,000 and $85,000 for a full project, from demolition to the last cabinet handle. A kitchen that keeps its layout with good mid-range finishes sits in the lower half; opening a wall to the dining room, adding an island and moving the plumbing pushes it to the top. This guide explains the kitchen renovation cost in Mississauga for houses and condos, what moves the price most and how a kitchen is built in the right order.

TGV Construction Group Inc. has completed more than 300 projects across the GTA and Ontario since 2017, with our own team and licensed trades. For more ideas, read our Toronto kitchen cost guide and the kitchen cost-saving tips; the service page is kitchen renovation.

Mississauga kitchens: what we usually find

Mid-century houses. In Port Credit, Lorne Park, Clarkson and Applewood, many bungalows and side-splits have small, closed kitchens with a window over the sink and a dining room behind a wall. Opening that wall is the most common request, and it changes the budget most because it may involve a beam, a permit and rerouted pipes or ducts.

1970s and 1980s family homes. Erin Mills, Meadowvale and Mississauga Valleys are full of two-storeys and backsplits with kitchens that were often updated once in the 1990s. The cabinets are tired, the counters laminate, and the lighting a single ceiling fixture. These kitchens are often good candidates for a new kitchen in the same footprint with a peninsula or island added.

Condos. Around City Centre and along Hurontario there are many condominium kitchens. Space is tight, the plumbing stack and the exhaust route are fixed, and the building sets the rules. The work is smaller but the logistics, elevator bookings, working hours and protection of common areas, take careful planning.

What drives the kitchen renovation cost in Mississauga

Layout and walls. Keeping the sink, range and dishwasher in place is the most cost-effective approach. Moving the sink to an island, relocating the range or removing a wall adds plumbing, electrical, venting and sometimes structural work.

Cabinets. Cabinets are usually the largest single item. Stock, semi-custom and custom lines differ in box construction, door style, drawer hardware and lead time, and full-height upper cabinets or a pantry wall add boxes quickly.

Counters and backsplash. Laminate, quartz and natural stone differ widely, and so does the labour for a waterfall edge, a large island slab or a full-height stone backsplash.

Electrical. Modern kitchens need dedicated circuits for the range, microwave, dishwasher and counter outlets, plus pot lights and under-cabinet lighting. Older panels sometimes need an upgrade to carry the load.

Ventilation. A range hood that vents outside, rather than recirculating, needs a duct through a wall or roof. In a condo, the existing route usually decides what hood you can have.

Flooring and appliances. Continuing new flooring into adjacent rooms, and choosing panel-ready or professional-style appliances, both add to the total.

Renovated kitchen with white cabinets, granite counters, a stainless range and a chimney hood
Our job: kitchen renovation, Toronto.

The kitchen renovation process, step by step

  1. Measure and talk. We measure the room and the walls around it, open the cabinets under the sink, check the electrical panel and ask how you cook, store and eat.
  2. Layout and selections. Cabinet layout, counters, backsplash, flooring, lighting and appliances are chosen together, because appliance sizes set the cabinet sizes.
  3. Written quote. Every part of the job is listed: demolition, cabinets, counters, plumbing, electrical, flooring, drywall and paint, plus allowances.
  4. Permit or building approval. A permit from the City of Mississauga for a wall removal or structural change; in a condo, the corporation's approval and work rules.
  5. Order long-lead items. Cabinets and appliances are ordered so they arrive before demolition is finished.
  6. Demolition and structure. The old kitchen comes out; if a wall is being opened, a beam and posts are installed as engineered.
  7. Rough-ins. New circuits for the range, dishwasher, microwave and counter outlets, moved plumbing for the sink or an island, and the hood duct to the outside.
  8. Drywall, flooring and paint. Walls and ceiling are patched or replaced; flooring goes in before or after cabinets depending on the product.
  9. Cabinets, templating and counters. Cabinets are set level, the counter is templated, cut and installed, then the backsplash is tiled.
  10. Appliances and finish. Appliances, sink, faucet, lights, hardware and trim go in; we test, clean and walk through with you.

Timeline

Plan for two to four weeks of design and selections, then the cabinet lead time, which can be from a few weeks for stock lines to two months or more for custom ones. On site, most kitchens take five to eight weeks. The counter is templated after the cabinets are installed and usually arrives about a week later; the backsplash follows. A temporary kitchen in another room, with the fridge, a microwave and a kettle, makes the weeks easier.

Permits and condo approvals

The City of Mississauga issues building permits under the Ontario Building Code. Replacing cabinets and counters in the same layout usually does not need one; removing or altering a load-bearing wall, or adding a new plumbing fixture in a new location, does. Electrical work is permitted through the Electrical Safety Authority. In a condominium, the corporation's written approval normally comes first, along with its rules on hours, noise, protection and contractor insurance. Our GTA permit guide covers the general process.

Ways to get more kitchen for the budget

  • Keep the wet wall. The sink and dishwasher on the existing plumbing wall save more than any finish change.
  • Spend on drawers. Deep drawers in the lower cabinets are easier to use than shelves and change the kitchen more than a premium door style.
  • Choose one feature. A striking island counter or a tiled feature wall behind the range gives character without upgrading everything.
  • Plan lighting in layers. Pot lights, under-cabinet strips and a pendant over the island make a mid-range kitchen look like a high-end one.
  • Compare scope, not totals. Our guide to comparing renovation quotes explains what to line up.
Finished kitchen with white cabinets, stainless appliances and hardwood floor
Our job: kitchen with new hardwood floor, Pickering.

A typical Mississauga kitchen project

A 1982 backsplit in Erin Mills has a closed U-shaped kitchen with oak cabinets, a laminate counter and a wall between the kitchen and the dining room. The owners open part of that wall with a flush beam, add a peninsula with seating, install white shaker cabinets with full-extension drawers, a quartz counter, a tiled backsplash, a hood vented outside, pot lights and new flooring continued into the dining room. With the permit for the wall and a five-week cabinet lead time, the work on site runs about seven weeks and lands in the upper half of the Mississauga range. The same kitchen without the wall change would sit in the lower half.

Frequently asked questions

How much does a kitchen renovation cost in Mississauga?

Most full kitchen renovations in Mississauga cost between $40,000 and $85,000. A kitchen kept in the same layout with mid-range cabinets and quartz counters sits in the lower half; an open-concept kitchen with a removed wall, an island and upgraded appliances sits at the top of the range or above. A free site visit gives you a written figure.

Can you remove the wall between my kitchen and dining room?

Often, yes. If the wall carries load, an engineer sizes a beam and the City of Mississauga issues a permit before we open it. Pipes, ducts or a plumbing stack in the wall can add cost or limit what is possible; we check at the visit.

Can I renovate a condo kitchen in Mississauga?

Yes, within the condominium corporation's rules. Most require approval before work, set working hours and elevator bookings, and limit changes to plumbing stacks, venting and flooring underlay. We review the rules and plan around them.

How long does a kitchen renovation take?

Most kitchens take five to eight weeks on site, plus the time for cabinets to arrive. Counters are templated after the cabinets are set, which usually adds about a week before the backsplash.

Is it cheaper to keep my existing layout?

Yes. Keeping the sink, range and dishwasher where they are saves plumbing, electrical and venting work, and is usually the largest single saving in a kitchen budget.

Ask for a free kitchen renovation quote in Mississauga

We renovate kitchens in Mississauga houses and condos, and across Oakville, Brampton and the GTA, with one team handling design, permits and construction.

Phone (365) 363-6995, email estimating@tgvconstructiongroup.ca, or tell us about your Mississauga kitchen project on the Get a Quote page.

Every home is different. Prices on this website are only rough ranges from typical GTA projects, not a quote: your price depends on what we find on site, the size and condition of the space, the materials you choose and the permits needed, and it is set only in your written quote after a site visit.

Free quote

Planning a project or dealing with damage?

TGV gives free quotes across the GTA. Emergencies: 24/7.

Get a Quote +1 (365) 363-6995

The TGV blog

Renovation know-how, delivered

Real costs, permit tips and restoration advice for GTA homes and businesses - written by the team that does the work.

  • Cost guides for GTA projects
  • Permits, timelines and checklists
  • One short email, only when we publish

By subscribing, you agree to receive an email from TGV Construction Group Inc. when we publish new blog posts - at most once a day. You can unsubscribe at any time. Privacy Policy

Ready to start your project?

Free quotes across the Greater Toronto Area. Water, fire or storm damage? Our team responds 24/7.